Fungicides – Foliar Treatment
478
•
Safety - page 25 • First aid - page 33 • Resistance management - page 41
Acapela
Group 11
Formulation
Product
Company
Active ingredient
Formulation
Container size
Acapela (PCP# 30470)
E.I. duPont Canada
Picoxystrobin: 250 g/L Suspension
9.6
L
Crops, Diseases, Rate and Timing
Crops
Diseases
Rate per acre Staging and specific comments
Dry legumes (chickpea, field
pea, lentil, dry beans*)
Mycosphaerella blight
(
Mycosphaerella pinodes
)
on
field pea
Asian soybean rust (
Phakospora
pachyrhizi
)
240 - 350
mL
Begin applications prior to disease
development and continue on a 7 - 14 day
interval. Use higher rate and shorter interval
when disease pressure is high.
Suppression of Sclerotiinia
rot/white mould (
Sclerotinia
sclerotiorum
)
350
mL
Make initial preventative application at
beginning of bloom and follow with second
application 7 - 10 days later at full bloom.
Wheat
Leaf rust (
Puccinia recondita
),
Septoria leaf blotch (
Septoria
tritici
),
powdery mildew
(
Erysiphe graminis
),
tan spot
(
Pyrenophora tritici-repentis
)
175 - 350
mL
Begin applications prior to disease
development and continue on a 7 - 14 day
interval. Use higher rate and shorter interval
when disease pressure is high.
Apply at Feekes 9 (flag leaf emerged). Do
not apply after flowering (Feekes 10.5).
Barley
Septoria leaf blotch (
Septoria
tritici
),
powdery mildew,
(
Erysiphe graminis
)
175 - 350
mL
Oats
Powdery mildew (
Erysiphe
graminis)
175 - 350
mL
Rye, triticale
Leaf rust (
Puccinia recondita
),
Septoria leaf blotch (
Septoria
tritici
),
powdery mildew
(
Erysiphe graminis
)
175 - 350
mL
Corn (field corn, sweet corn,
seed popcorn)
Northern corn leaf blight
(
Setopsphaeria turcica,
Exserohilum turcicum
)
215 - 325
mL
Begin applications prior to disease
development and continue on a 7 - 14 day
interval. Use higher rate and shorter interval
when disease pressure is high.
Soybean
Asian soybean rust (
Phakospora
pachyrhizi
),
brown spot
(
Septoria glycines
),
frogeye
leafspot (
Cercospora sojina
)
175 - 350
mL
Begin applications prior to disease
development and continue on a 7 - 14 day
interval. Use higher rate and shorter interval
when disease pressure is high.
Suppression of Sclerotinia stem
rot/white mould (
Sclerotinia
sclerotiorum
)
350
mL
Make initial preventative application at 100%
bloom (1 flower blooming on all plants) and
follow with 2nd application 7 - 10 days later
at full bloom.
*
See label for registered bean types.
Registered Tank Mixes
None registered.
Application Information
How to apply
:
Ground and aerial application.
Water volume
:.
Ground: 45 L/acre minimum. Aerial: 20 L/acre minimum.